Mining  

We did Twickenham shaft in Limpopo including hackney shat shaft with high pressured vacuum pump vamping and sweeping. That include samancor buffelsfontein shaft in North West. We recommended long anchor support installation and vent Hollings seals. Underground roadways and belts maintenance was included. Plus cement slab eractions under conveyor belts with cleaning involved.

We also supplied with professional earth moving machinery expects when needed. Aquarius shaft at kroondal steel reclamation was imposed effectively and more efficient. We reclaimed all conveyor belts in a form of cutting cost for the mine operations. That saved money and forward move for the strike and centre belts was efficient. Glencore waterval shaft also was involved. We help mainly with belt operating system’s including labour. Slime dams both underground and surface was maintained by us.

Tharisa mine in buffelspoort we installed high mast flood lights. Rasimone north shaft waste development was drilled and blasted by us. Including box fronts and ore pass along the development path. All service pipes left out at remnant places were collected and re-used again including old steel such as winches and other steel materials. All left out ore was swept and cleaned out resulting in increase for tonnage. My team consists of experts in both mechanised and conventional mining. We do extra low profile mining operations like we vamped Anglo Bathopele shaft. We have specialty in both mining. Lonmin saffy was mechanised and we were called to convert into conventional mining. The whole process was a success that’s including the pattern of support and mining formation.